Soil Consolidation during Construction Essay Example | Topics and Well Written Essays - 1250 words

Soil Consolidation during Construction - Essay ExampleGenerally, either undrained fill or unloading will produce excess pore pressures in the loading atomic number 18a. Hence, construction of any type of infrastructure generates pressure on the kingdom on which the construction takes place. The excess pore pressures may be positive or negative, depending on the long term steady state pore pressures. In time, these excess pore pressures give rise to hydraulic gradients which cause seepage f crushed which then results to changes in the volume of the soil. Hence, the changes in soil volume are based upon the changes of effective stress as the excess pore pressures disperse.The gradual reduction in volume of a fully saturated soil of low permeability which is caused when stress is what integrating refers to. More specifically, consolidation is the union of seepage caused by hydraulic gradients with compression due to the flow of the leakages and changes of effective stress dictated against the soil. Consolidation leads to drainage of some of the pore piss, which triggers the continuity of soil consolidation until the excess pore water pressure caused by the stress against the soil has entirely dispersed.Through the test of time, consolidation leads to settlement of foundations or constructions due to the gradual softening of soil in excavations. Therefore, consolidation settlement is basically the vertical perturbation of the construction as a result of the volume change of soil during the consolidation. Hence, if a building is built over a layer of saturated clay, consolidation settlement will cause a stratum overlying a clay layer. Likewise, if an excavation is made in a saturated clay, crowding, the reverse of settlement, skunk be observed in the bottom of the excavation. This, on the other hand, is due to swelling of the clay resulting to a gradual increase in volume of the soil.The roughly basic case of consolidation is that of one-dimensional on wh ich the strain generated against the soil is zero-lateral. atomic number 53-dimensional consolidation occurs when all seepage flow and the effective stress place against the soil is vertical. Hence, there should be no radial seepage or strain. If effective lateral stress is placed against the soil, the settlement will occur faster. This is because of the torture of the soil under undrained conditions, in addition to consolidation settlement. Immediate settlement brook be estimated using the results from elastic theory, which will be suitable to determine the elastic properties of the soil.Furthermore, before a structure is completely conceptualised, the magnitude and the rate of consolidation settlement should first be predicted using effective tools. One of the popular processes used in predicting the progress of consolidation is by setting up piezometers in order to document the change in pore water pressure with time. The scale of consolidation settlement can be determined b y recording the levels of appropriate reference points on a construction and in the surface on which it will be built. In such measurement, levelling of the reference points should be accurate, working from a point of reference which is not subject to any type of settlement. During this process, every output should be documented, as this will determine the competence of theoretical methods to be used.The attributes of a soil during one-dimensional consolidation can be measured through oedometer test. This test, developed

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.